The indicative scope of work includes, but is not limited to, the following: a) Review existing ESIA documents, technical studies, and design updates related to marine works of the Bay Terminal Project. b) Update environmental and social baseline conditions, including marine water quality, sediment, ecology, and socio-economic aspects. c) Assess potential environmental and social impacts of dredging, reclamation, breakwater, and associated marine construction activities. d) Evaluate compliance with national regulations and World Bank Environmental and Social Framework (ESF), including gap analysis. e) Conduct stakeholder identification, consultation and disclosure in accordance with regulatory and donor requirements. f) Assess impacts on fisheries, livelihoods, occupational health and safety, and vulnerable groups and prepare subsequent Resettlement Action Plan & Livelihood Restoration plan. g) Analyze climate change risks, disaster resilience, and cumulative environmental impacts. h) Update Environmental and Social Management Plans (ESMP), including monitoring, mitigation, and emergency response measures. All studies and designs shall be in accordance with the highest standards of international engineering profession.
Ministry of Shipping, Chittagong Port Authority, Project Director (BTMIDP)
Ministry of Shipping
- Tender ID
- 🔒 Register to see
- 📅 Published
- 4 Oct 2026, 6:00 PM (17 days ago)
- Earnest money
- —
- Document price
- —
- Pre-bid meeting
- —
- 🛒 Last date to buy
- —
- Views
- 0
- Expiry
- 25 Oct 2026
- Opening
- 25 Oct 2026, 6:00 PM
- ⏰ Submission deadline
- 25 Oct 2026, 6:00 PM 4 days left
Reference no.
18.13.0000.000.000.07.0020.25
Brief description
The indicative scope of work includes, but is not limited to, the following: a) Review existing ESIA documents, technical studies, and design updates related to marine works of the Bay Terminal Project. b) Update environmental and social baseline conditions, including marine water quality, sediment, ecology, and socio-economic aspects. c) Assess potential environmental and social impacts of dredging, reclamation, breakwater, and associated marine construction activities. d) Evaluate compliance with national regulations and World Bank Environmental and Social Framework (ESF), including gap analysis. e) Conduct stakeholder identification, consultation and disclosure in accordance with regulatory and donor requirements. f) Assess impacts on fisheries, livelihoods, occupational health and safety, and vulnerable groups and prepare subsequent Resettlement Action Plan & Livelihood Restoration plan. g) Analyze climate change risks, disaster resilience, and cumulative environmental impacts. h) Update Environmental and Social Management Plans (ESMP), including monitoring, mitigation, and emergency response measures. All studies and designs shall be in accordance with the highest standards of international engineering profession.