The indicative scope of work includes, but is not limited to, the following: a) Review existing ESIA documents, technical studies, and design updates related to marine works of the Bay Terminal Project. b) Update environmental and social baseline conditions, including marine water quality, sediment, ecology, and socio-economic aspects. c) Assess potential environmental and social impacts of dredging, reclamation, breakwater, and associated marine construction activities. d) Evaluate compliance with national regulations and World Bank Environmental and Social Framework (ESF), including gap analysis. e) Conduct stakeholder identification, consultation and disclosure in accordance with regulatory and donor requirements. f) Assess impacts on fisheries, livelihoods, occupational health and safety, and vulnerable groups and prepare subsequent Resettlement Action Plan & Livelihood Restoration plan. g) Analyze climate change risks, disaster resilience, and cumulative environmental impacts. h) Update Environmental and Social Management Plans (ESMP), including monitoring, mitigation, and emergency response measures. All studies and designs shall be in accordance with the highest standards of international engineering profession.
Ministry of Shipping, Chittagong Port Authority, Project Director (BTMIDP)
Ministry of Shipping
- টেন্ডার আইডি
- 🔒 রেজিস্টার করে দেখুন
- 📅 প্রকাশ
- 4 Oct 2026, 6:00 PM (17 দিন আগে)
- জামানত (Earnest Money)
- —
- শিডিউলের দাম
- —
- প্রি-বিড মিটিং
- —
- 🛒 শিডিউল কেনার শেষ
- —
- দেখেছেন
- 0
- মেয়াদ শেষ
- 25 Oct 2026
- খোলার তারিখ
- 25 Oct 2026, 6:00 PM
- ⏰ জমার শেষ তারিখ
- 25 Oct 2026, 6:00 PM 4 দিন বাকি
রেফারেন্স নম্বর
18.13.0000.000.000.07.0020.25
কাজের সংক্ষিপ্ত বিবরণ
The indicative scope of work includes, but is not limited to, the following: a) Review existing ESIA documents, technical studies, and design updates related to marine works of the Bay Terminal Project. b) Update environmental and social baseline conditions, including marine water quality, sediment, ecology, and socio-economic aspects. c) Assess potential environmental and social impacts of dredging, reclamation, breakwater, and associated marine construction activities. d) Evaluate compliance with national regulations and World Bank Environmental and Social Framework (ESF), including gap analysis. e) Conduct stakeholder identification, consultation and disclosure in accordance with regulatory and donor requirements. f) Assess impacts on fisheries, livelihoods, occupational health and safety, and vulnerable groups and prepare subsequent Resettlement Action Plan & Livelihood Restoration plan. g) Analyze climate change risks, disaster resilience, and cumulative environmental impacts. h) Update Environmental and Social Management Plans (ESMP), including monitoring, mitigation, and emergency response measures. All studies and designs shall be in accordance with the highest standards of international engineering profession.